Design modification of the existing cooling water system of Marsyangdi hydropower station using pipe flow modeling software
Loading...
Date
2022-09-15
Journal Title
Journal ISSN
Volume Title
Publisher
Thapathali Campus, Institute of Engineering, Tribhuvan University
DOI
10.3126/jiee.v5i1.47662
Abstract
Marsyangdi Hydropower Station has adopted the Open Loop Cooling System (also called Once through Cooling System) in which the cooling water extracted from Penstock or the draft tube is circulated throughout the cooling system and discharged back to the draft tube. The water of the Marsyangdi River is muddy and sediment-rich in the rainy season, which causes the choking of tubes of the primary heat exchangers reducing the cooling efficiency and even leading to leakages in the tubes due to erosion. Cleaning and maintenance of the tubes are impossible without dismantling the primary heat exchangers from the Unit assembly. Hence, hours of machine shutdown is required to replace them with new or cleaned one. A Close Loop Cooling System has been modeled in the Software, "AFT Fathom," to overcome the issue in the Existing Cooling System. The modified model was run to observe the performance of the modified system at different river water temperatures and increased heat duty in all the heat exchangers. Further, the System Curve was considering the effect of the increase in surface roughness of pipelines due to aging. The performance capacity of the modified system was justified considering the obtained results from the simulations.
Description
Journal: Journal of Innovations in Engineering Education (JIEE), ISSN 2594-343X (print), 2773-823X (online)
Volume/Issue: Vol. 5, Issue 1 (2022), pages 105-112
Article type: Research Article
Published: 2022-09-15
DOI: https://doi.org/10.3126/jiee.v5i1.47662
Authors and affiliations:
- Prabhab Bista (IOE, Thapathali Campus)
- Subodh Kumar Ghimire (Department of Automobile and Mechanical Engineering, Institute of Engineering, Thapathali Campus)
- Rama Sapkota
TCIOE department(s): Department of Automobile and Mechanical Engineering
Publisher: Thapathali Campus, Institute of Engineering, Tribhuvan University
License: Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International (CC BY-NC-ND 4.0), https://creativecommons.org/licenses/by-nc-nd/4.0/
Journal website: https://journal.tcioe.edu.np/articles/22e41986-bd4d-4cd8-aa8c-cbb5a9cea010
NepJOL: https://www.nepjol.info/index.php/jiee/article/view/47662
Keywords
Open Loop , Close Loop , Cooling System , Marsyangdi Hydropower Station , AFT Fathom , JIEE , Journal of Innovations in Engineering Education , JIEE 2022 , JIEE Volume 5 , Research Article , Thapathali Campus , TCIOE , Institute of Engineering , IOE , Tribhuvan University , Nepal , engineering research Nepal , peer-reviewed journal article , open access , Department of Automobile and Mechanical Engineering
Citation
Bista, P., Ghimire, S. K., & Sapkota, R. (2022). Design modification of the existing cooling water system of Marsyangdi hydropower station using pipe flow modeling software. Journal of Innovations in Engineering Education, 5(1), 105-112. https://doi.org/10.3126/jiee.v5i1.47662
Endorsement
Review
Supplemented By
Referenced By
Creative Commons license
Except where otherwise noted, this item's license is described as Copyright (c) 2022 JIEE and the authors. Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International (CC BY-NC-ND 4.0).